Construction & Home ImprovementLast reviewed: November 2026

Cubic Yard Calculator

A cubic yard calculator converts length, width and depth into cubic yards, cubic feet and cubic meters — the units bulk materials are sold in. Enter your dimensions in feet, inches or meters and it gives the volume to order for concrete, gravel, topsoil or mulch, with a reminder to allow extra for compaction and waste.

Key facts:
  • One cubic yard equals 27 cubic feet.
  • One cubic yard covers 81 sq ft at 4 inches deep.
  • One cubic meter equals 1.31 cubic yards.
  • A 30 by 20 ft slab at 4 inches needs 7.41 cubic yards.

Loading calculator…

Share or Export Current Results

Share Cubic Yard Calculator directly or copy link to clipboard

TwitterLinkedInFacebookWhatsApp

Calculation Formula & Mathematical Engine

Theoretical equation governing this computation.

Yards^3 = \frac{Length_{ft} \times Width_{ft} \times Depth_{ft}}{27} = \frac{Volume_{ft^3}}{27}

Variable Definitions

Yards^3Standard bulk unit of volume (1 yard = 27 cubic feet)
Volume_{ft^3}Length × Width × Depth in feet

Step-by-Step Calculation Example

Calculating Volume for a 30ft × 20ft Slab at 4" Depth

Scenario: Converting dimensions into cubic yards.
Length30 ft
Width20 ft
Depth4 inches (0.333 ft)
Execution Steps
  1. 1Multiply dimensions: 30 × 20 × (4/12) = 200 cu ft
  2. 2Divide by 27: 200 ÷ 27 = 7.41 cubic yards
  3. 3Metric equivalent: 7.41 × 0.764555 = 5.67 cubic meters
Final Verified Output:7.41 Cubic Yards (200 Cubic Feet | 5.67 Cubic Meters)

Comprehensive Practical Guide

In-depth analysis, domain guidelines, standard practices, and common pitfalls.

Why Are Volumes Measured in Cubic Yards?

One cubic yard is a 3-foot by 3-foot by 3-foot cube (3 × 3 × 3 = 27 cu ft). In North American construction, concrete transit mixers, quarry gravel, topsoil, and mulch are universally sold and delivered by the cubic yard.

How Many Cubic Yards Do I Need? Quick Reference

At 4 inches deep, one cubic yard covers 81 sq ft. So a 10 by 10 ft slab at 4 inches needs about 1.23 cubic yards, a 20 by 20 ft slab needs about 4.94, and the worked example — a 30 by 20 ft slab at 4 inches — needs 7.41 cubic yards. Always round up to the nearest half yard and add 10% for waste and compaction.

Frequently Asked Questions About Cubic Yard Calculator

Direct, verified answers to common calculation and methodology questions.

Divide total cubic feet by 27, since one cubic yard is 27 cubic feet. For example, 200 cubic feet divided by 27 is 7.41 cubic yards.
Authoritative Sources & Data References:
  • NIST Handbook 44: Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices

Disclaimer: Allow for compaction and grading waste when placing material orders.